THE COMMISSIONING IS CARRIED OUT BY OUR BEST TRAINED SERVICE TECHNICIANS
A high level of service is achieved through regular training and further education.
SAPOTEC OFFERS COMMISSIONING OF THE FOLLOWING PRODUCT GROUPS:
- UPS systems
- Emergency power generators
- Rectifier systems
- Battery systems
In order to be able to carry out a full function test after commissioning, we are happy to support you with our mobile load banks!
COMMISSIONING OF UPS SYSTEMS
Commissioning includes the inspection of the UPS connection that has been made. Our service technician checks the correct fit of cables and plug connections within the UPS system.
These could possibly have loosened during the transport. In this way, the future operator can be certain that the UPS system will function properly and can rely on the manufacturer to assume the guarantee. The connections between batteries, battery modules or battery cabinets and the UPS system are made by the service technician if the systems are adjacent. If the installation sites are further apart, the necessary connections are usually included in the scope of delivery of the electrician. The UPS system is tested for proper function.
If a load test is carried out according to the operator's wishes, there is a suitable opportunity to do so on this day. The operator takes care of the corresponding load.