External Maintenance Bypass 16-400A, separate

Separate bypass switch

The external manual bypass is connected to the mains supply in parallel with the UPS. If the UPS is switched off or removed for maintenance or service purposes or for replacement, the connected loads are supplied directly from the mains without interruption. Switching back to UPS operation is also possible without interruption. This work can be performed without disconnecting consumers during normal working hours. Results are cost savings and high availability security of the UPS system

Functions and features

arrow_right_alt External maintenance bypass 16A bis 10kVA separate bypass switch


arrow_right_alt External maintenance bypass 40A bis 20kVA separate bypass switch


arrow_right_alt External maintenance bypass 63A bis 30kVA separate bypass switch


arrow_right_alt External maintenance bypass 80A bis 40kVA separate bypass switch


arrow_right_alt External maintenance bypass 100A bis 60kVA separate bypass switch


arrow_right_alt External maintenance bypass 125A bis 80kVA separate bypass switch


arrow_right_alt External maintenance bypass 160A bis 100kVA separate bypass switch


arrow_right_alt External maintenance bypass 200A bis 120kVA separate bypass switch


arrow_right_alt External maintenance bypass 250A bis 160kVA separate bypass switch


arrow_right_alt External maintenance bypass 315A bis 200kVA separate bypass switch


arrow_right_alt External maintenance bypass 400A bis 250kVA separate bypass switch


Advantages and special features

arrow_right_alt The Load do not have to be switched off


arrow_right_alt When servicing the UPS system, a test load can be connected to the UPS without risking a failure of the loads


arrow_right_alt Work can be carried out during normal working hours